Difference between revisions of "VTube-STEP v1.91"

From ATTWiki
Jump to: navigation, search
(25px ENHANCED: QuickLoad Improved With New Default Folder Button)
(25px ENHANCED: System Options - Keep or Delete Imported Model During Project Save)
Line 59: Line 59:
 
</tr>
 
</tr>
 
</table>
 
</table>
 
===[[image:Check.jpg|25px]] ENHANCED: System Options - Keep or Delete Imported Model During Project Save ===
 
<table cellpadding=10>
 
<tr valign=top>
 
<td width=400>
 
You can now choose whether or not to save the imported model into the VTube project file for recall later in VTube-STEP.
 
<br><br>
 
This is a new persistent configuration feature.  When this option is disabled, then any imported model already in VTube-STEP will be saved as part of the VTube project file.<br><br>
 
[[image:vtube-step-1.90-keepcollection.png|300px]]
 
</td>
 
<td width=500>
 
[[image:vtube-step-1.90-delete-imported-model-before-save-project.png|500px]]<br><br>
 
</td>
 
</tr>
 
</table>
 
 
  
 
===[[image:Check.jpg|25px]] NEW: Project Batch Report Output ===
 
===[[image:Check.jpg|25px]] NEW: Project Batch Report Output ===

Revision as of 14:08, 30 June 2014

Vtube-step logo.jpg

Revision 1.91

300px




Check.jpg NEW: Automatic Calculation of Cut Length

VTube-STEP now automatically calculates the cut length during calculation of the centerline from solid model.

The math engine uses the current tube elongation percentage to reduce the cut length to account for elongation in the bends.

Vtube-step-1.91 cutlength.png

Check.jpg NEW: AUTOMATIC Thin Wall

If the wall thickness is zero after a centerline calculation from solid model, then VTube now automatically inserts a value of 0.001" (or 0.0254mm) into the part setup. This cleans up the image by removing solid ends in the display.



Vtube-step-1.91 thinwall.png

Check.jpg ENHANCED: QuickLoad Improved With New Default Folder Button

The Quickload window has a new button that allows you to find the default VTube folder in public documents quickly.

Vtube-1.91-quickload default folder.png

Check.jpg NEW: Project Batch Report Output

Some of our customers are building huge databases of VTube project files. In order to help manage the data, VTube can now output a comma-delimited batch report of the data in all project files in any folder.

Vtube-1.90-project batch report output.png


Load the batch reporter in the Report menu of either STEP mode of LASER mode:

Vtube-1.90-project batch report button.png

This is a sample report file:

Vtube-1.90-project batch report file1.png

If the batch reporter finds files with 0 or negative length straights, then it will issue a WARNING at the end of the report log and create a second report file containing a list of all the project files with these lengths:

Vtube-1.90-project batch report file2.png

Check.jpg ENHANCED: Collected Data Now Saved In Project Files

The collected objects are now saved and recalled to and from VTube project files. (In previous versions, they were automatically erased.)

Vtube-laser-1.90-collectedalone.png


Check.jpg Other Changes

  • Fixed a bug where the XYZ would be deleted if the Collection process was still active just before the centerline calculation was started.



Other