Revision: Benderlink for BLM 5.3

From ATTWiki
Revision as of 21:50, 14 October 2015 by Mcone (Talk | contribs)

Jump to: navigation, search

Benderlink blm logo.jpg

Revision 5.3

Benderlinkblm v5.3 screen.png






Check.jpg NEW - Large Green LED to Show Measuring Center Monitoring

A new larger green LED port indicator to show that Benderlink is monitoring for measuring center communications is added to the interface.

It is also possible to click on the LED to toggle the measuring center monitor state.

Benderlinkblm v5.3 large led.png





Check.jpg NEW - Do Not Allow Measuring Center to Change End Lengths

During CORRECTION of parts with extra material on the ends, it is helpful to not allow the end lengths to change. This keeps the carriage in approximately the same start position.

Benderlink now includes this checkbox switch to turn this feature on or off.

Blinkblm donotallowmeasuringcenterchangeendlengths.png



Check.jpg ENHANCED - The Communications Protocol is Enhanced for LASERVISION Windows Version

The internal communications logic was enhanced to work properly with Windows versions of LASERVISION. (It already worked with DOS versions of LASERVISION.)

Vector tube data center.jpg



Check.jpg NEW - Click on LEDs to Toggle to Measuring Center Monitoring

You can now click on either LED indicator to toggle monitoring for the measuring center commmands.

Benderlinkblm v5.3 both leds.png



Check.jpg FIXED - Ping Port Confirmation Works in Newer Windows

This feature allows Benderlink to ping for a serial device server before opening a virtual port.

The feature worked in older Windows - but did not work in Windows 7 and higher. Now it works in the newer Windows versions too.

Blinkblm pingportconfirmation.png



Check.jpg NEW - Message Warning for Ports That Cannot Open

When a port to the measuring center cannot open, Benderlink now displays a message that a problem occurred.

400



Other Pages