Difference between revisions of "How to Setup Reports to Show Bender Plus Adjusted Data"
From ATTWiki
(→STEP 3 - COPY Master LRA to Setup LRA) |
(→STEP 2 - Enter the Bender Data Setup Menu) |
||
Line 31: | Line 31: | ||
<td width=500> | <td width=500> | ||
This is an important step that for building good adjustment reports. Remember that VTube gets the bender setup data in the reports from the blue columns in the Bender Data Setup menu - not the MASTER LRA data.<br><br> | This is an important step that for building good adjustment reports. Remember that VTube gets the bender setup data in the reports from the blue columns in the Bender Data Setup menu - not the MASTER LRA data.<br><br> | ||
− | In this example, the tube has been inspected, the but the blue columns are still set to zero. The blue columns contain the values that the bender will have before correction. So if the blue columns are all zeros, then the reports will show bender data setup as all zeros + adjustments.<br><br> | + | In this example, the tube has been inspected, '''the but the blue columns are still set to zero''' (see below). The blue columns contain the values that the bender will have before correction. So if the blue columns are all zeros, then the reports will show bender data setup as all zeros + adjustments.<br><br> |
[[image:vtube_benderdatasetup_bluecol_zeros.jpg|700px]] | [[image:vtube_benderdatasetup_bluecol_zeros.jpg|700px]] | ||
</td> | </td> |
Revision as of 03:35, 22 September 2012
Setup VTube-LASER Reports to Show Bender Plus Adjusted Data
|
STEP 1 - Measure and Align the Measured Tube with the Master
Enter the MASTER data, then measure and align the measured tube to the master data. |
STEP 2 - Enter the Bender Data Setup Menu
STEP 3 - COPY Master LRA to Setup LRA
Other Pages
- Back to VTube-LASER