VTube-LASER Training Agenda
|
Contents |
About the Training Agenda
|
Training agendas for VTube-LASER usually follow the pattern shown below. |
Number of Trainees and Types of Trainees
|
The number of trainees in the training depends on the role each trainee is assigned. Hands-on TraineeHands-on trainees handle the computer and arm. n the steps we show below, many of the actions are hands-on practice. If we have 3 trainees, then the step will require 3 iterations. If we have 5 trainees, then the step will require 5 iterations. Having too many students in the hands-on training may limit how much information we can give. The fewer the number of hands-on trainees, the faster training goes. Observer TraineeIf you limit some of the trainees to observers, then the training will move more quickly, and we will be able to teach more information. |
Typical Training Agenda
Day 1
| STEP | INSTALLATION / TRAINING TASK |
| 1 |
Arm installation and setup |
|
2 |
Bender integration assistance |
|
3 |
Probe and scanner calibration |
|
4 |
Setup a program from solid model |
|
5 |
How to setup a program from a print |
|
6 |
Arm connection and scanner setup |
|
7 |
Measuring Cut Planes (measuring the table surface) |
|
8 |
General measuring setup (set your default tolerances into VTube-LASER) |
|
9 |
How to measuring the tube/pipe |
|
10 |
Understanding the inspection results to qualify the tube shape |
|
11 |
Using BENDER SETUP to connect to benders for setup and correction |
|
12 |
How to view reports |
|
13 |
How to reverse-engineer a tube |
|
14 |
Address any unique application needs |
|
15 |
Hands-on practice for students |
Day 2
| STEP | INSTALLATION / TRAINING TASK |
| 1 |
Review what we learned on day 1 - quiz the trainees |
|
2 |
Practice full corrections loops with actual customer parts |
|
3 |
Review special application needs |
Other Pages
- Back to VTube-LASER