Revision: Benderlink for Chiyoda/Keins 5.93

From ATTWiki
Jump to: navigation, search
Blinkchilogo.jpg

Blink chikeins v5 93 splash.jpg


Check.jpg NEW CALC - Calculate Primary Set Point Section

This new section is added to the FPB 1 page in the Bender Data Edit menu. This feature allows operators to calculate Primary and Pipe Set Point values for the starting location of the tube. It uses a formula that is displayed on the screen.

Blink chikeins calc primary set point.jpg

Check.jpg CHANGE- Change Calc Edit Buttons with the Keyboard

Calc Edit buttons in the Bend Data section previously would not allow for keyboard input unless the calculator icon was pressed. This has been change so that the boxes can accept input either way.

Also, the number decimal places is increased to 3.

Blink chikeins calc box keyboard input.jpg




OTHER PAGES